Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/clients/936c704aca2a8fed6d838420012e5279/test/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the fl-builder domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/clients/936c704aca2a8fed6d838420012e5279/test/wp-includes/functions.php on line 6121
Piscine à Guichen (35) - Etamine
Centre Aquatique
Le centre aquatique de Guichen est construit sur une parcelle non aménagée. Le bois est un matériau biosourcé utilisé pour la réalisation de la charpente de l'ouvrage.
#Centre aquatique #performance énergétique #bois
Piscine à Guichen (35)
Maître d'Ouvrage Vallons de Haute Bretagne Communauté
ArchitecteBVL architecture
BET Fluides et traitement d'eauETHIS
Rôle d'ETAMINEBET environnement
Livraison2024
Travaux HT8.5 M€
Surface3400 m²

Crédit photos : BVL

Le programme

Construction d’un centre aquatique comprenant notamment :

  • Un bassin sportif de 350 m²,
  • Un bassin ludique de 117 m²,
  • Un espace bien-être en extérieur avec spa, sauna, hammam, et tisanerie fermée.

La contribution d'Etamine au projet

Conduite des études énergétiques et environnementales : simulations thermiques dynamiques, études d’éclairement, d’ensoleillement.

Suivi de chantier propre.

Suivi de la conception énergétique et environnementale du projet: suivi de chantier.